think You’re DA-Ready? The Common Compliance Mistakes Hiding in Early Plans

ree

Getting your design approval ready can feel like a big milestone. The plans are polished, the design is set, and you’re ready to move forward. But before you hit submit, there’s one crucial question to ask: are you really DA-ready?

At Studio Terra, we review hundreds of projects each year, and we see the same issues come up time and time again. Small oversights at the early design stage can cause unnecessary redesigns, missed BASIX targets, and approval delays that could have been avoided with a bit of early clarity.





The top three compliance mistakes we see

1. Skipping the pre-assessment stageIt’s tempting to dive straight into documentation, but without a pre-assessment, critical energy efficiency details often get missed. A quick early review can highlight design changes that improve compliance and comfort without affecting aesthetics or budget.

2. Assuming a 6-star design will “just pass” BASIXEvery project site behaves differently. Orientation, climate zone and construction type all influence your BASIX outcome. A design that performs well in one region can fail in another. Treating 7-star performance as an early goal rather than an afterthought gives you more flexibility and control later.

3. Leaving energy modelling until the endWaiting until plans are final to run a NatHERS assessment often means design changes are needed when it’s least convenient. Early energy modelling gives you insights that can shape smarter building choices from the start — saving time, money and stress.


How to avoid them

The best way to prevent compliance headaches is to bring your ESD consultant in early. Share your plans and specifications upfront, and get a pre-design review before you lodge your DA. Early collaboration keeps your design intent intact while meeting all regulatory requirements.


Book a Clarity Call

If you’re not sure how BASIX, NatHERS or the 7-star changes will affect your project, a Clarity Call can help. It’s a short, practical session where we’ll walk through your design, answer your compliance questions, and outline the next steps to keep your project moving smoothly.


Whether you’re an architect, builder, or planning your own home, this early guidance can save weeks of redesigns and make approvals far less stressful.


Book a Clarity Call today to make sure your project is DA-ready for the first submission.



 
 

Recent Posts

See All

Acknowledgement of Country

​​

Studio Terra respectfully acknowledges the Awabakal People as the Traditional Owners and Custodians of the land on which our office is located.

We extend this acknowledgment to all Aboriginal and Torres Strait Islander peoples as the Traditional Custodians of this country and its waters. We pay our respects to Elders past and present, and recognise their enduring connection to Country. We honour the knowledge, culture, and stories that continue to guide sustainable practices and care for the land.

(02) 4927 5476

hello@studioterra.com.au

PO Box 32

NEW LAMBTON NSW 2305

ABN 65 688 198 478

Studio Terra Icon

© 2025 by Studio Terra Consulting.

 

bottom of page